The second fix is in, but doors catch on the frame, architraves stand proud of the wall and skirting stops just short of the corner. This visit is about lining the timber up and getting the joins right — not building furniture.
Typical jobs
Doors and frames that need easing, adjusting or finishing
Skirting and architrave with open ends, gaps or uneven returns
Raw timber edges left behind after a renovation
After the visit
We finish what fits in the visit and tell you in writing if a second visit or more timber is needed.
Included
Second-fix finishing around doors, frames and timber trims
Aligning and making good visible joinery joins
A written note of remaining joinery, priced if more is needed